ROW & infrastructure permitting

Pathway supports utility, roadway, and infrastructure projects requiring coordination with municipalities, counties, TxDOT, and other agencies.

  • ROW permits
  • TxDOT
  • Utility coordination
  • Roadway
  • Easements
  • SUE

S-201 · Included

What the engagement covers

Right-of-way permit coordination

Across municipal, county and state facilities, each with its own application, standards and review path.

TxDOT coordination

Access and permitting on state facilities, coordinated with the local jurisdiction where the two overlap.

Utility coordination

Managing the relationship between the project team and each affected utility, including relocation and joint-use questions.

Easement coordination

Document preparation flow, agency review, and recording.

SUE coordination

Integrating subsurface utility engineering results into the permitting and design sequence.

Application and document management

One place where every application, comment, response and approval for the corridor is tracked.

D-201 · Deliverables

What you receive

  1. Agency and facility inventory for the corridor

  2. Permit matrix by agency with submittal requirements

  3. Coordinated application packages

  4. Comment and resubmittal tracking per agency

  5. Approved permits and conditions summarized for construction

W-100 · Waypoints

How it runs

  1. Stage 01 · No cost

    Understand the project

    We establish scope, jurisdiction, development status, approvals already completed, and the decisions still outstanding. You get a straight read on what the project is actually facing.

  2. Stage 02

    Map the path

    We identify the likely approvals, permitting dependencies, agency requirements, consultants needed, and the major project milestones, including the sequencing gates that determine what can be filed when.

  3. Stage 03

    Coordinate the team

    We manage communication and deliverables among ownership, consultants, contractors, utilities, and reviewing agencies, so responsibility for each next action is unambiguous.

  4. Stage 04 · Ongoing

    Manage the process

    We follow applications, reviews, comments, responses, resubmittals and approvals per department rather than per project, and escalate whichever review has stalled.

  5. Stage 05 · Through issuance

    Keep moving

    We maintain visibility into what is complete, what is outstanding, and what needs to happen next, through issuance and close-out.

Q-001 · Questions

On this service

Who has jurisdiction over our driveway?

It depends on the facility, not the address. A driveway onto a state highway is TxDOT; onto a city street it is the city; in unincorporated county it is the county road department. Corridors that change jurisdiction mid-project are common and are worth confirming early.

Do city rules apply in the ETJ?

Partly, and it varies. Georgetown publishes that zoning does not apply in its ETJ, but subdivision regulations, tree preservation, signage, environmental and stormwater rules, public improvements and driveway permits do. Round Rock directs ETJ property owners to call the Building Inspection Division to confirm. We verify per parcel.